Cheney Dam Beaver Draft
Aquatic Life & Ecosystem

Details

Large 0f9ac5db 796e 414c 816c 46e84e3c9daa

Project Name

Cheney Dam Beaver Draft

Project Description

Sound Dampening: Bald Cypress ...(Taxodium distichum) barrier. Damn Monk: Internal restoration and repair. Beaver Damage: Removal of fallen trees and shrubs; back-fill of tunnels, burrows, and diggings. Erosion Sediment: Evaluation, temporal silt fencing, partial removal and relocation of deposits; water pattern flow remediation.

Body of Water

Watershed

Project Owner

David Cheney

Share

Location

Discussions

0 threads

Please login to post to the discussion

This project does not have data yet.